ELECTRICAL DESIGN GROUP

COMMISSIONING 

INSTRUCTIONS                                                                                                
                                                                                             

The commissioning templates are provided complementary for the use by contractors preparing a commissioning report for a project designed and documented by the Electrical Design Group. The use of the template is not compulsory and is provided only for assistance. Should the contractor have a proprietary operation and maintenance manual that complies with the requirements of the specification the contractor is welcome to use it.

The commissioning templates are a guide only and it is the contractor’s responsibility to review the template and ensure all information contained is relevant as well as include any relevant information that has not been included in the template.

The commissioning templates have been generated in MS Word XP and is colour coded as follows:

RED This text, paragraph or section is either in or out. Delete as required.

GREEN This text, paragraph or section is must be edited in every case.

BLUE This text is provided as information for the author and must be deleted.

PURPLE This text, paragraph or section is either in or out. If this is in it must be edited in every case. Delete or edit as required.

YELLOW This information is preliminary and has been included for future review and updating. The author must review this information in every case and independently decide on the appropriate relevant action.

    

Download all Documents in one .zip file
Pre-Commissioning Checklist
Pre-Commissioning Completion Certificate
Commissioning Plan Checklist
Commissioning Checklist
Light Commissioning Checklist
Commissioning Completion Certificate
Checklist
Electrical Services Commissioning Plan

 