|
C0398a-E01.dwg |
LEGEND & SITE PLAN |
D |
D |
|
C0398a-E02.dwg |
BASEMENT 4 LEVEL FLOOR / RCP |
B |
B |
|
C0398a-E03.dwg |
BASEMENT 3 LEVEL FLOOR / RCP |
B |
B |
|
C0398a-E04.dwg |
BASEMENT 2 LEVEL FLOOR / RCP |
B |
B |
|
C0398a-E05.dwg |
BASEMENT 1 LEVEL FLOOR / RCP |
B |
B |
|
C0398a-E06.dwg |
GROUND LEVEL FLOOR / RCP |
K |
K |
|
C0398a-E07.dwg |
LEVEL 1 FLOOR / REFLECTED CEILING PLAN |
G |
G |
|
C0398a-E08.dwg |
LEVEL 2 FLOOR / REFLECTED CEILING PLAN |
F |
F |
|
C0398a-E09.dwg |
LEVEL 3 FLOOR / REFLECTED CEILING PLAN |
F |
F |
|
C0398a-E10.dwg |
LEVEL 4 FLOOR / REFLECTED CEILING PLAN |
H |
H |
|
C0398a-E11.dwg |
LEVEL 5 FLOOR / REFLECTED CEILING PLAN |
H |
H |
|
C0398a-E12.dwg |
ENERGEX SUBSTATION ARRANGEMENTS |
E |
E |
|
C0398a-E13.dwg |
ENERGEX SUBSTATION ARRANGEMENTS |
F |
F |
|
C0398a-E14.dwg |
ROOF FLOOR PLAN, DETAILS & SCHEMATICS |
A |
A |
|
C0398a-E15.dwg |
MAIN SWITCHBOARD SCHEMATIC |
E |
E |
|
|
|
|
|
|
C0398a-0001.xls |
CONTRACT DOCUMENT SCHEDULE |
U |
|
|
C0398a-0002.xls |
EQUIPMENT SCHEDULE |
G |
|
|
C0398a-0003.xls |
STANDARDS SCHEDULE |
B |
|
|
C0398a-0004.xls |
UNIT RATES SCHEDULE |
A |
|
|
C0398a-0005.xls |
TENDER BREAKUP SCHEDULE |
A |
|
|
C0398a-0006.xls |
INFO TO BE SUBMITTED BY SUBCONTRACTOR |
A |
|
|
C0398a-0007.xls |
ABBREVIATION SCHEDULE |
A |
|
|
C0398a-0008.xls |
DISTRIBUTION BOARD DB-B SCHEDULE |
B |
|
|
C0398a-0009.xls |
DISTRIBUTION BOARD DB-G1 SCHEDULE |
C |
|
|
C0398a-0010.xls |
DISTRIBUTION BOARD DB-G2 SCHEDULE |
C |
|
|
C0398a-0011.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0012.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0013.xls |
DISTRIBUTION BOARD DB-11 SCHEDULE |
B |
|
|
C0398a-0014.xls |
DISTRIBUTION BOARD DB-12 SCHEDULE |
B |
|
|
C0398a-0015.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0016.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0017.xls |
DISTRIBUTION BOARD DB-21 SCHEDULE |
B |
|
|
C0398a-0018.xls |
DISTRIBUTION BOARD DB-22 SCHEDULE |
B |
|
|
C0398a-0019.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0020.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0021.xls |
DISTRIBUTION BOARD DB-31 SCHEDULE |
B |
|
|
C0398a-0022.xls |
DISTRIBUTION BOARD DB-32 SCHEDULE |
B |
|
|
C0398a-0023.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0024.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0025.xls |
DISTRIBUTION BOARD DB-41 SCHEDULE |
C |
|
|
C0398a-0026.xls |
DISTRIBUTION BOARD DB-42 SCHEDULE |
C |
|
|
C0398a-0027.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0028.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0029.xls |
DISTRIBUTION BOARD DB-51 SCHEDULE |
D |
|
|
C0398a-0030.xls |
DISTRIBUTION BOARD DB-52 SCHEDULE |
C |
|
|
C0398a-0031.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0032.xls |
NO LONGER REQUIRED |
|
|
|
C0398a-0033.xls |
DISTRIBUTION BOARD DB-S SCHEDULE |
A |
|
|
C0398a-0037.xls |
BMS SCHEDULE |
C |
|
|
|
|
|
|
|
C0398a-0008.doc |
ELECTRICAL SERVICES SPECIFICATION |
C |
|
|
|
|
|
|